CMS Platform Redesign
When - 2014
Team - PM, Scrum Master, UX / UI Project Lead, CTO, Dev Lead
Role - UX / UI Project Lead
Scope - Redesign eBays Global Brand Center and drive the project to completion.
Duration - 4 week sprint
Skills - Project scope, task and problem analysis, design thinking, site analysis, gather requirements, lean strategy, wire frames, user flow, interaction design, presentation, drive project
Tools - Pen, Paper, Illustrator, Photoshop
This project was a redesign. The challenge was to rethink and redefine the usability and refine the UI to better the user experience. I had just 30 days from my start date (and it had to be on brand). I created a time line strategy that layered lean UX, Visual Design (15 screens) and DEV all happening at once on a sliding scale.